India’s First CBG Plant

INPUT QTY

75-600 TPD

FEEDSTOCK

Sugar Industry Waste, Napier Grass, Paddy Straw, MSW waste

OUTPUT

CBG: 3-15 TPD

TOTAL PROJECTS

3

Our Flagship: Satara, Bhuinj

Commissioned in 2013 as India’s first Compressed Biogas plant, our Satara facility converts 600 tonnes of sugar industry waste per day into 26,000 m³ of biogas — upgraded to 12,000 Nm³ of high-purity CBG daily.

Today it supplies 7,500 kg of CBG per day to GAIL and BPCL under the CGD Synchronization Scheme, with long-term industrial offtake alongside.

More than a decade of continuous operation at Satara is why our plants are engineered the way they are: for stable biology, not just handover day.

Engineered For Purity

Our gas upgradation delivers biomethane purity above 96% with ultra-low moisture — reducing H₂S from inlet levels as high as 35,000–40,000 ppm to below 5 ppm. Built for continuous operation across diverse organic feedstocks.

How It Works

Organic waste is fed into our anaerobic digesters, where bacteria break it down into raw biogas. The gas is purified and compressed into CBG — ready for the grid or vehicle fuel — while the residue becomes organic fertilizer. Biologix monitors it all in real time.

Planning a CBG project? From feedstock assessment to offtake, we've done it before — as owner-operators.

Input:
Output:
Location:

Input:
Output:
Location:

Input:
Output:
Location:

Input:
Output:
Location:

Input:
Output:
Location: